The fascia boards have all been successfully installed, as have most of the shingles.  The contents of the sheds have been organized, and the sheds have been swept out.  Most of the vent pieces for under the eaves have been cut and labeled, they just need to be installed.


Remaining tasks:

  1. Empty out storage unit at Super Space Storage in Sunnyvale and use trucks/vans to move contents over to Valley Church and into the sheds. (Must be completed by 1/31/2014!)

  2. Put up remaining trim pieces (on/around door 1, and the horizontal pieces on the backs of the two sheds under the gables).

  3. Paint the unpainted fascia pieces dark brown (paint and brushes are in shed number 2).

  4. Install ridge shingles on shed number 2

  5. Use roofing cement to seal exposed nail heads on both roofs

  6. Install vent pieces on the eaves

  7. Install lock on shed number 1


Share

0 Comments



Leave a Reply.

Details

    Volunteer central

    This is the central place for updates on our latest volunteer activity and needs.

    Archives

    January 2014

    Categories

    All

    RSS Feed

A child holding a bow and arrow, from the music
A young girl holding a doll plays the role of
A smiling girl with dark hair portrays the role of
A young girl smiles and points in the air, as she plays the role of one of Peter Pan's friends, in the musical
A young boy plays the role of the
©Copyright 2021 Chrysalis Arts Ministries
Logo/Branding by Narrator
  • Home
  • About Chrysalis
  • Fall Concert
  • Policies
    • Accessibility Policies
    • Casting Policies
    • Content Policies
    • Dress Code
  • Wall Of Honor
  • Join The Team